27 September 2012

Port and Polish

Yes. Port and Polished  Intake Manifold installed together with Port and Polished Cylinder Head.

Fierce heartbeat.

Inhaling part is done, gotta plan the exhaling part ASAP.

24 September 2012

Engine Enhancing

Gathering items that going to put into me this morning.
Spent a year to gathered these item.....


At Mech Tan's workshop, pending for installation.


In progress. =D




Old head:



Assembling...


Parts need to be replaced, due to corrosion:


Mech Tan's partner, Ah Shun saw the engine head, and he told Aron about having some preparation because it going to have bad fuel consumption....

25 September 2012
Item found.


Aron was shocked when he saw the IACV from halfcut. .....compare to the 1 that he brought....


Bought an original BB1 radiator as well.


26 September 2012
Everything is on. Testing in progress....


19 September 2012

Preparing

Got the parcel from MJ today.






Pending for installation.

SMOOTH BREATH!

And not to forget, few things needed to complete the installation. (Thanks to MJ for listing out the item! )

Cam Seal.






And we also need Head Gasket, cam pulley oil seal, and valve cover gasket.

Blogger Templates by OurBlogTemplates.com 2007